![GE T17 Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/ge/t17/t17_installation-manual_127652015.webp)
Model T17 Installation Guide
7
Chapter 2. Installing the Pipe Nozzles
2.2.2 Selecting and Marking the First Nozzle Location - Diametrical (cont.)
To mark the first nozzle location, complete the following steps:
1.
For optimum performance, you should select a location that has at least 20 pipe diameters of straight,
undisturbed flow upstream and 10 pipe diameters of straight, undisturbed flow downstream from the
measurement point (see
below). Undisturbed flow means avoiding sources of turbulence such as
valves, flanges, elbows, swirl and disturbed flow profiles.
Figure 6: Diametrical Nozzle Locations
2.
We recommend that you install the nozzles on a diameter as near as possible to the horizontal plane
(i.e., 3 o’clock and 9 o’clock positions) for a horizontal pipe.
Note:
If you cannot find a proper location, please consult with GE Flow Application engineering.
3.
At the 3 o’clock position, center punch the pipe to mark the position for the center of the first nozzle, as shown
in
below.
Figure 7: Mark First Nozzle Location
FLOW
NOZZLE
2 PLACES
10D
20D
D
45°
TOP VIEW
END VIEW
TOP
Side View
Содержание T17
Страница 1: ...GE Oil Gas Flow 916 128 Rev D September 2020 Model T17 Ultrasonic Flow Transducer Installation Guide ...
Страница 2: ......
Страница 4: ...ii no content intended for this page ...
Страница 62: ...Chapter 2 Installing the Pipe Nozzles 54 Model T17 Installation Guide no content intended for this page ...
Страница 64: ...Chapter 3 Installing an Isolation Valve 56 Model T17 Installation Guide no content intended for this page ...
Страница 88: ...Chapter 6 Specifications 80 Model T17 Installation Guide no content intended for this page ...
Страница 90: ...Warranty 82 Model T17 Installation Guide no content intended for this page ...
Страница 92: ......
Страница 93: ......