Figure 101: Communication through network using the electrical Ethernet port
Figure 102: Minimum distances for the equipment mounting
Figure 103: Mounting panel to install two remote acquisition modules (RA331/332) in a
Figure 104: Pre-insulated tubular pin terminals
Figure 105: Header connector assembly
Figure 106: AC/DC power connection
Figure 107: AC/DC power connection
Figure 110: RPV311 Fiber Optic Connectors
Figure 111: RA331, RA332 and RA333 fiber optic connectors
Figure 112: Connection between RPV311 and the RA331, RA332 or RA333
Figure 113: Screws of the Back Panel
Figure 114: Analog input terminals
Figure 115: Screws of the Back Panel
Figure 117: Analog Input Terminals to TW Measurement
Figure 118: Analog Input Terminals
Figure 119: Screws of the Back Panel
Figure 121: Analog Input Terminals
Figure 122: Screws of the Back Panel
Figure 124: Connection Diagram of DC Transducer Inputs ± 10 V
Figure 125: Analog Input Terminals
Figure 126: Screws of the back panel
Figure 128: Connection Diagram of DC Transducer Inputs ± 20 mA
Figure 129: Polarity of the Current Clamp Connection
Figure 130: Digital Input Terminals
Figure 131: Connection Diagram of Digital Inputs
Figure 132: Electrical and optical inputs for sync using IRIG-B
Figure 133: Connection diagram of electrical synchronism inputs
Содержание RPV311
Страница 2: ......
Страница 44: ......
Страница 99: ...RPV311 Chapter 5 Operation RPV311 TM EN 7 99 Figure 46 Status monitoring sequence ...
Страница 101: ...RPV311 Chapter 5 Operation RPV311 TM EN 7 101 Figure 47 Monitoring sequence ...
Страница 104: ...Chapter 5 Operation RPV311 104 RPV311 TM EN 7 Figure 49 Records monitoring sequence harmonics flicker and SOE ...
Страница 106: ...Chapter 5 Operation RPV311 106 RPV311 TM EN 7 Figure 50 Equipment settings monitoring sequence ...
Страница 107: ...RPV311 Chapter 5 Operation RPV311 TM EN 7 107 Figure 51 Circuit and channel settings monitoring sequence ...
Страница 108: ...Chapter 5 Operation RPV311 108 RPV311 TM EN 7 Figure 52 Relays PMU and MODBUS settings monitoring sequence ...
Страница 110: ...Chapter 5 Operation RPV311 110 RPV311 TM EN 7 Figure 53 General information monitoring sequence ...
Страница 142: ......
Страница 149: ...RPV311 Chapter 9 TW Fault Locator RPV311 TM EN 7 149 Figure 75 TW Fault Location example 1 ...
Страница 152: ......
Страница 160: ......
Страница 162: ......
Страница 164: ......
Страница 204: ......
Страница 265: ...Chapter 17 Technical Specifications RPV311 RPV311 TM EN 7 265 Figure 142 RPV311 Dimensions ...
Страница 275: ...Chapter 17 Technical Specifications RPV311 RPV311 TM EN 7 275 Figure 143 RA331 RA332 and RA333 dimensions ...
Страница 279: ...RPV311 Appendix A Equipment Log RPV311 TM EN 7 279 ...