
Chapter 3
– Hardware Design
RPV311
RPV311-TM-EN-7
37
Historical average at aggregation intervals of 1 or 10 minutes (optional);
Measurement and recording of harmonics up to the 50th order according to
IEC 61000-4-7 (optional);
Measurement and recording of flicker according to IEC 61000-4-
15:1997+A1:2003 (optional);
Cross-trigger using standard network connection;
One-end fault location based on Takagi algorithm;
Flexible communication:
Two 10/100BaseT electrical Ethernet interfaces;
Two embedded optical Ethernet converters;
RS232 serial port for modem connection;
Support for IEC 61850:
Up to 320 binary inputs related to GOOSE messages (optional);
Two Ethernet ports for redundant connection (optional);
One Ethernet port for Process Bus (Sampled Values) connection (optional).
Local interface on the front panel;
dry-contact relays for remote signalling;
Fax and
/
or e-mail message after detection of a trigger. The fax can be sent to
two different destinations and the e-mail to four different destinations (optional).
2.1.2
Components
Front view of the RPV311, showing all the main components on the front panel.
Figure 3: Front View of the RPV311
A
Indicators of the state of the equipment:
A
B
C
Содержание RPV311
Страница 2: ......
Страница 44: ......
Страница 99: ...RPV311 Chapter 5 Operation RPV311 TM EN 7 99 Figure 46 Status monitoring sequence ...
Страница 101: ...RPV311 Chapter 5 Operation RPV311 TM EN 7 101 Figure 47 Monitoring sequence ...
Страница 104: ...Chapter 5 Operation RPV311 104 RPV311 TM EN 7 Figure 49 Records monitoring sequence harmonics flicker and SOE ...
Страница 106: ...Chapter 5 Operation RPV311 106 RPV311 TM EN 7 Figure 50 Equipment settings monitoring sequence ...
Страница 107: ...RPV311 Chapter 5 Operation RPV311 TM EN 7 107 Figure 51 Circuit and channel settings monitoring sequence ...
Страница 108: ...Chapter 5 Operation RPV311 108 RPV311 TM EN 7 Figure 52 Relays PMU and MODBUS settings monitoring sequence ...
Страница 110: ...Chapter 5 Operation RPV311 110 RPV311 TM EN 7 Figure 53 General information monitoring sequence ...
Страница 142: ......
Страница 149: ...RPV311 Chapter 9 TW Fault Locator RPV311 TM EN 7 149 Figure 75 TW Fault Location example 1 ...
Страница 152: ......
Страница 160: ......
Страница 162: ......
Страница 164: ......
Страница 204: ......
Страница 265: ...Chapter 17 Technical Specifications RPV311 RPV311 TM EN 7 265 Figure 142 RPV311 Dimensions ...
Страница 275: ...Chapter 17 Technical Specifications RPV311 RPV311 TM EN 7 275 Figure 143 RA331 RA332 and RA333 dimensions ...
Страница 279: ...RPV311 Appendix A Equipment Log RPV311 TM EN 7 279 ...