
Chapter 12
– RPV Tools
RPV311
RPV311-TM-EN-7
176
Power line file configuration
<length>nnn</length>
Nominal length of the line as the owner of the
line claims (in kilometers)
<k1>nnn<k1>
Is the coefficient related to the length of the
line, represents the actual length of the cable
of the line.
This value can be adjusted using data of faults
subsequent to the commissioning
<k2>nnn<k2>
Is the coefficient related to the light speed
factor
<terminal_a>Location,Identifier,Line</termi
nal_a>
STATIONID,DEVICEID and the terminal
identifier
<terminal_b>Location,Identifier,Line</termi
nal_b>
STATIONID,DEVICEID and the terminal
identifier
<tower id=”X” name=”NAME”>
Is the identification of the towers and their
geographic coordinates. This information must
be provided by the user
<latitude>nnn</latitude>
<longitude>nnn</longitude>
<distance>nnn</distance>
</tower>
The geographic coordinates are optional and must be provided by the user.
The technical note "Traveling Wave Fault Locator (NT0802)" shows how the
coefficients K1 and K2 are calculated.
A model of the power line configuration file is created in the directory
C:
\
RPV
\
faultlocator
\
conf of Windows after the RPV Tools installation. The power line
configuration model is shown below.
<
?xml version="1.0" encoding="UTF-8"?
>
<
line
>
<
length
>
100
<
/length
>
<
k1
>
100
</
k1
>
<
k2
>
1
</
k2
>
<
terminal
_
a
>
LOCATION,IDENTIFIER,LINE
</
terminal
_
a
>
<
terminal
_
b
>
LOCATION,IDENTIFIER,LINE
</
terminal
_
b
>
</
line
>
Make a copy of the file and edit it with the parameters related to the power line to be
monitored.
Содержание RPV311
Страница 2: ......
Страница 44: ......
Страница 99: ...RPV311 Chapter 5 Operation RPV311 TM EN 7 99 Figure 46 Status monitoring sequence ...
Страница 101: ...RPV311 Chapter 5 Operation RPV311 TM EN 7 101 Figure 47 Monitoring sequence ...
Страница 104: ...Chapter 5 Operation RPV311 104 RPV311 TM EN 7 Figure 49 Records monitoring sequence harmonics flicker and SOE ...
Страница 106: ...Chapter 5 Operation RPV311 106 RPV311 TM EN 7 Figure 50 Equipment settings monitoring sequence ...
Страница 107: ...RPV311 Chapter 5 Operation RPV311 TM EN 7 107 Figure 51 Circuit and channel settings monitoring sequence ...
Страница 108: ...Chapter 5 Operation RPV311 108 RPV311 TM EN 7 Figure 52 Relays PMU and MODBUS settings monitoring sequence ...
Страница 110: ...Chapter 5 Operation RPV311 110 RPV311 TM EN 7 Figure 53 General information monitoring sequence ...
Страница 142: ......
Страница 149: ...RPV311 Chapter 9 TW Fault Locator RPV311 TM EN 7 149 Figure 75 TW Fault Location example 1 ...
Страница 152: ......
Страница 160: ......
Страница 162: ......
Страница 164: ......
Страница 204: ......
Страница 265: ...Chapter 17 Technical Specifications RPV311 RPV311 TM EN 7 265 Figure 142 RPV311 Dimensions ...
Страница 275: ...Chapter 17 Technical Specifications RPV311 RPV311 TM EN 7 275 Figure 143 RA331 RA332 and RA333 dimensions ...
Страница 279: ...RPV311 Appendix A Equipment Log RPV311 TM EN 7 279 ...