Critical Power
Modifications reserved
Page 28/43
GE_UPS_ISG_LPS_3UL_20K_30K_2US_V010.docx
Installation Guide
LP33 Series 20 & 30 UL S2
Access to the terminals and instructions for top feed cable connections
Fig. 4.8.1-2 Access to the input / output connections
To access input, output and battery
connections proceed as follows:
Open the front door “
A
” of the cabinet.
Remove the protection panel “
B
”.
Remove the bottom fascia cover “
C
”.
Rout cable through side channel cable
entry.
Use appropriate knockout in top cover shown
above.
Route cable through side channel as shown on
left.
NOTE !
For top feed applications, knock out appropriate holes in side channel cover for
cable conduits. See
Fig 4.8.1-2
C
A
B
LPS33U_0
20-030_S2
_Connectio
n_TEC_01
Q2 Q1
LP
S3
3U_0
20
-0
30
_S
2_C
onnec
tio
n_T
EC
_F
ro
nt
_0
1
TOP FEED
AC ROUTING
LPS33U_
02
0-030
_S
2_Co
nn
ec
tion
_TEC
_To
p_0
1
7X KNOCKOUTS
FOR " CONDUIT
29.66"
753.4m
6.04"
153.4m