Critical Power
Modifications reserved
Page 4/43
GE_UPS_ISG_LPS_3UL_20K_30K_2US_V010.docx
Installation Guide
LP33 Series 20 & 30 UL S2
Preface
Congratulations on your choice of a
LP33
Series 20 & 30 Uninterruptible Power Supply
(UPS).
It will help eliminate load disturbances due to unexpected power problem.
This
Installation Guide
describes how to prepare the installation site, and it provides
weight and dimensions and procedures for moving, installing and connecting the UPS.
While every care has been taken to ensure the completeness and accuracy of this manual,
GE
assumes no responsibility or liability for any losses or damages resulting from the use
of the information contained in this document.
WARNING !
LP33 Series
20 & 30 is a product that needs to be installed by a licensed and
knowledgeable contractor.
We recommend that this manual be kept next to the UPS for future references.
If any problems are encountered with the procedures contained in this manual, please
contact your
Service Center
before you proceed.
This document shall not be copied or reproduced without the permission of
GE
.
Some of the information contained in this manual may be changed without notice to
reflect technical improvements.
Safety instructions
Read the safety instructions contained on the following pages carefully before the
installation of the UPS, options and battery system.
Pay attention to the rectangular boxes included in the text:
They contain important information and warning concerning electrical connections and
personnel safety.
Parallel version secured with RPA
When included in the text, this symbol refers to operation needed
only for Parallel System.