Critical Power
Modifications reserved
Page 19/43
GE_UPS_ISG_LPS_3UL_20K_30K_2US_V010.docx
Installation Guide
LP33 Series 20 & 30 UL S2
4.6
UNPACKING
Move the equipment in it’s original packing, carton box or wooden case, until the place of installation
and remove the packing and the transport sockets only just before installing the UPS.
1
Procedure for the unpacking of the UPS:
Make sure to have sufficient space
around the UPS before you start
unpacking.
Cut the two straps
“
A
”
fixing the
carton box.
2
Remove package
“
B
and
C
”
.
Remove the protection
“
D
”
outside
the cabinet and the accessories bag.
3
Fig. 4.6-1 LP33 Series 20 & 30 unpacking sequence
Use a forklift to raise the UPS from the
floor.
Remove the two wooden plates
“
E
”
.
NOTE !
Be aware of the heavy
weight of the UPS, in
particular if already
equipped
with
Batteries.
Included in the delivery you can find the following parts:
Control Bus cables (only for RPA Parallel System)
CD-ROM connectivity
An accessories bag
NOTE !
The wheels are designed only for limited movements on the installation site.
LPS33U_030-
040_Un
packing
_02
GRAVIT
Y
CENTE
R
of
of
GRAVIT
Y
CENTE
R
D
UL
C
B
E
E
E
LPS33U
_030-040
_Unpackin
g_03