GE
LOGIQ V5/LOGIQ V3
D
IRECTION
5496012-100, R
EVISION
3
B
ASIC
S
ERVICE
M
ANUAL
Chapter 3 - System Setup
3 - 11
Section 3-5
Completing the Installation
3-5-1
Power On / Boot Up
NOTE:
After turning off a system, wait at least ten seconds before turning it on again. The system may not be
able to boot if power is recycled too quickly.
3-5-1-1
Scanner Power On
When power is applied to the scanner, power is distributed to the Cooling Unit, Control Panel, LCD,
Peripherals and the Back-end Processor.
3-5-1-2
Turn on the system
Press the
Power On/Off
switch at the front of the system once.
When the
Power On/Off
switch on the Control Panel is pressed once, the Back-end Processor starts
and the software code is distributed to initiate the scanner.
No status messages are displayed during this process.
Figure 3-3 Power On/Off Switch
Содержание LOGIQ V3
Страница 1: ...GE LOGIQ V5 LOGIQ V3 Basic Service Manual Part Number 5496012 100 Revision 3 ...
Страница 2: ......
Страница 11: ...GE LOGIQ V5 LOGIQ V3 DIRECTION 5496012 100 REVISION 3 BASIC SERVICE MANUAL ix ZH CN KO ...
Страница 27: ......
Страница 116: ...GE LOGIQ V5 LOGIQ V3 DIRECTION 5496012 100 REVISION 3 BASIC SERVICE MANUAL 4 34 Section 4 5 Peripheral Checks ...
Страница 145: ......
Страница 169: ......
Страница 170: ... 2014 General Electric Company GE GEMedical Systems Ultrasound 9900 Innovation Drive Wawautosa Wisconsin 53226 USA ...