GE
LOGIQ V5/LOGIQ V3
D
IRECTION
5496012-100, R
EVISION
3
B
ASIC
S
ERVICE
M
ANUAL
3 - 8
Section 3-3 - Receiving and Unpacking the Equipment
9
Remove the foams beside the LCD monitor and
the control panel.
10
Cut the packing straps around the four wheels
and remove the foams beside the wheels.
Note: To aviod injury, lock the wheels before
cutting the packing straps.
11
Unlock the wheels, and then hold the control
panel at the front side to move the system until
the front two wheels on the ground, and then
slowly move the whole system on the ground.
Table 3-4:
Unpacking the equipment
Step
Description
Corresponding Graphic
Содержание LOGIQ V3
Страница 1: ...GE LOGIQ V5 LOGIQ V3 Basic Service Manual Part Number 5496012 100 Revision 3 ...
Страница 2: ......
Страница 11: ...GE LOGIQ V5 LOGIQ V3 DIRECTION 5496012 100 REVISION 3 BASIC SERVICE MANUAL ix ZH CN KO ...
Страница 27: ......
Страница 116: ...GE LOGIQ V5 LOGIQ V3 DIRECTION 5496012 100 REVISION 3 BASIC SERVICE MANUAL 4 34 Section 4 5 Peripheral Checks ...
Страница 145: ......
Страница 169: ......
Страница 170: ... 2014 General Electric Company GE GEMedical Systems Ultrasound 9900 Innovation Drive Wawautosa Wisconsin 53226 USA ...