GE
LOGIQ V5/LOGIQ V3
D
IRECTION
5496012-100, R
EVISION
3
B
ASIC
S
ERVICE
M
ANUAL
4 - 2
Section 4-3 - General Procedure
Section 4-3
General Procedure
4-3-1
Power On/Boot Up
After connect the system to the electrical supply, the power is applied to the scanner. When the Control
panel
Power On/Off
key is pressed once, the System starts.
4-3-1-1
Scanner Power On
When power is applied to the scanner, power is distributed to the Cooling Unit, Control Panel, LCD,
Peripherals and the Back-end Processor.
4-3-1-2
Turn on the system
Press the
Power On/Off
switch at the front of the system once.
When the
Power On/Off
switch on the Control Panel is pressed once, the Back-end Processor starts
and the software code is distributed to initiate the scanner.
No status messages are displayed during this process.
CAUTION
SYSTEM REQUIRES ALL COVERS
Operate this unit only when all board covers and frame panels are securely in place. The
covers are required for safe operation, good system performance and cooling purposes.
Figure 4-1 Power On/Off Switch
Содержание LOGIQ V3
Страница 1: ...GE LOGIQ V5 LOGIQ V3 Basic Service Manual Part Number 5496012 100 Revision 3 ...
Страница 2: ......
Страница 11: ...GE LOGIQ V5 LOGIQ V3 DIRECTION 5496012 100 REVISION 3 BASIC SERVICE MANUAL ix ZH CN KO ...
Страница 27: ......
Страница 116: ...GE LOGIQ V5 LOGIQ V3 DIRECTION 5496012 100 REVISION 3 BASIC SERVICE MANUAL 4 34 Section 4 5 Peripheral Checks ...
Страница 145: ......
Страница 169: ......
Страница 170: ... 2014 General Electric Company GE GEMedical Systems Ultrasound 9900 Innovation Drive Wawautosa Wisconsin 53226 USA ...