GE H
EALTHCARE
D
IRECTION
5162630, R
EVISION
3
LOGIQ™ S6 S
ERVICE
M
ANUAL
Section 10-3 - Periodic Maintenance Schedule
10-7
Section 10-5
System Periodic Maintenance
10-5-1
Preliminary Checks
The preliminary checks take about 15 minutes to perform. Refer to the system user documentation
whenever necessary.
Table 10-6 System Preliminary Checks
Step
Item
Description
1
Ask & Listen
Ask the customer if they have any problems or questions about the equipment.
2
Paperwork
Fill in the top of the Periodic Maintenance (PM) Inspection Certificate. Note all probes and system
options.
3
Power up
Turn the system power on and verify that all fans and peripherals turn on. Watch the displays during
power up to verify that no warning or error messages are displayed.
4
Probes
Verify that the system properly recognizes all probes.
5
Displays
Verify proper display on the monitor and touch panel.
6
Presets
Backup all customer presets on an CD-R.
Содержание LOGIQ S6
Страница 2: ......
Страница 9: ...vii GE HEALTHCARE DIRECTION 5162630 REVISION 3 LOGIQ S6 SERVICE MANUAL...
Страница 12: ...GE HEALTHCARE DIRECTION 5162630 REVISION 3 LOGIQ S6 SERVICE MANUAL x This page was intentionally left blank...
Страница 14: ...GE HEALTHCARE DIRECTION 5162630 REVISION 3 LOGIQ S6 SERVICE MANUAL xii...
Страница 317: ......