GE Grid Solutions
iBox/iBox Kit
Installation and Maintenance Guide
GE Information
994-0047-5.10-4
49
Boot Test Verification
, continued
Connect to
the
WESMAINT
port
Step
Action
1
Connect a WESMAINT cable to the female DB-9 WESMAINT port on
the top left side of your iBox.
2
Attach the other end of the WESMAINT cable to the PC’s selected
communications port.
3
Verify the power cable is properly connected to iBox, and power is
available.
4
The
POWER
and
RUN
indicators on the front upper left-hand corner
illuminate when power to the iBox is turned ON.
5
Monitor the VT100 terminal’s display
Result:
A series of text scripts displays as the POST routines are
performed. If you do not see the text scripts, check all
connections and repeat the procedure.
iBox Boot Up
The iBox automatically boots as soon as the power is turned on.
If the iBox fails to boot up, it may have sustained damage during shipping. Contact
GE Digital Energy for assistance.
Содержание iBox
Страница 142: ...iBox iBox Kit Installation and Maintenance Guide GE Grid Solutions 142 994 0047 5 10 4 GE Information ...
Страница 154: ...iBox iBox Kit Installation and Maintenance Guide GE Grid Solutions 154 994 0047 5 10 4 GE Information ...
Страница 156: ...iBox iBox Kit Installation and Maintenance Guide GE Grid Solutions 156 994 0047 5 10 4 GE Information ...
Страница 162: ...iBox iBox Kit Installation and Maintenance Guide GE Grid Solutions 162 994 0047 5 10 4 GE Information ...
Страница 172: ......