iBox/iBox Kit
Installation and Maintenance Guide
GE Grid Solutions
30
994-0047-5.10-4
GE Information
Physical Mounting
Procedure:
Mounting the
iBox
Step
Action
1
Align the iBox in its proper position on a flat mounting surface.
2
Install and tighten the four screws, holding the iBox firmly in place on
the mounting surface.
3
Loosen the iBox top cover and remove the battery “PULL” tab. The
iBox is delivered with this tab in place to insulate the battery during
shipment.
Mounting and
Clearance
Leave at least one rack unit (RU) of space above and below the equipment to allow
for cooling air flow and cable routing (1 RU = 1.75 inches or 44.5 mm).
Содержание iBox
Страница 142: ...iBox iBox Kit Installation and Maintenance Guide GE Grid Solutions 142 994 0047 5 10 4 GE Information ...
Страница 154: ...iBox iBox Kit Installation and Maintenance Guide GE Grid Solutions 154 994 0047 5 10 4 GE Information ...
Страница 156: ...iBox iBox Kit Installation and Maintenance Guide GE Grid Solutions 156 994 0047 5 10 4 GE Information ...
Страница 162: ...iBox iBox Kit Installation and Maintenance Guide GE Grid Solutions 162 994 0047 5 10 4 GE Information ...
Страница 172: ......