Section 4-3 - General Procedure
Section 4-3
General Procedure
4-3-1
Power On/Boot Up
NOTE:
After turning off the system, wait at least ten seconds before turning it on again. The system
may not be able to boot if power is recycled too quickly.
4-3-1-1
Scanner Power On
1.) Connect the Main Power cable to an appropriate mains power outlet.
2.) Switch ON the Main Circuit Breaker at the rear of the System.
When power is applied to the Scanner, and the Rear Circuit breaker is turned ON, Power is distributed
to the DC Power supply unit and power control assy in the AC power assy. When the Power ON/OFF
key is pressed once, the DC power supply is enabled and feed each DC power to board assemblies.
and system run the software
CAUTION
SYSTEM REQUIRES ALL COVERS
Operate this unit only when all board covers and frame panels are securely in place. The
covers are required for safe operation, good system performance and cooling purposes.
NOTICE
Lockout/Tagout Requirements (For USA only)
Follow OSHA Lockout/Tagout requirements by ensuring you are in total control of the Power Cable
on the system.