GE H
EALTHCARE
D
IRECTION
5394152,
Revision 5
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
Page 7-24
Section 7-1 - Overview
7-7-4-7
APS II
These programs are provided for testing the APS II board.
7-7-4-8
Keyboard
These programs are provided for testing the Front panel.
NOTE:
For the EchoBack test, it is highly recommended to press a button less than two times per a
second.
NOTE:
When Abort button is pressed to finish EchoBack test, you have to wait until “Completed.”
message is displayed to proceed other tests.
Table 7-8
FRU Test, APS II Diagnostics Menu
Menu
Descriptions
User
Level
Tools
Full Test
Performs all of the APS test listed below
All
None
HV voltage
stability
Read HV voltage and display HV values.
All
None
LV voltage
stability
Read HV voltage and display LV values.
All
None
Table 7-9
FRU Test, Keyboard Diagnostics Menu
Menu
Descriptions
User
Level
Tools
FRONT PANEL
Overall
Performs all of the Front Panel tests listed below
All
None
FRONT PANEL
Revision
Test EEPROM.Send test pattern to write to EEPROM and read.Displays the board
revision of the Front Panel.
All
None
ROM
Makes a check of internal ROM check sum.
All
None
RAM
Writes / reads data over all address of RAM and also makes a check of control
program.
All
None
EEPROM
Writes / reads data over all address of EEPROM
All
None
SWITCH
Test switch in Front Panel.
All
None
Echoback
Rotate or depress any key, Verify that it is displayed on the 17” LCD monitor. To finish
the test, press “Abort” key and wait until complete message appears.
All
None