GE H
EALTHCARE
D
IRECTION
5394152,
Revision 5
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
Chapter 8 -
Page 8-45
4.) Disconnect 1 connector from the PCB.
5.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-11-4
Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-83 TGC Key Connector
Table 8-12 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
5394152, Rev 1+, Section 8-2-11. Equipment
passed all required tests and is ready for use. “