2-6
Section 2-2 - Console Requirements
D
IRECTION
5771498-100, R
EVISION
6
V
ENUE
™ S
ERVICE
M
ANUAL
P R E L I M I N A R Y
2-2-9
Time and Manpower Requirements
Site preparation takes time. Begin site preparation checks as soon as possible, if possible, six weeks
before delivery, to allow enough time to make any changes.
WARNING
WARNING
FOR CONSOLE ULTRASOUND SYSTEMS AND FOR ULTRASOUND SYSTEMS
MOUNTED ON A DOCKING/ISOLATION CART, HAVE TWO PEOPLE AVAILABLE TO
DELIVER AND UNPACK THE ULTRASOUND SYSTEM.
CAUTION
Attempts to move the Ultrasound system considerable distances or on an inclive
by one person, could result in injury or damage or both.
Содержание H45051VN
Страница 477: ......