6. HARDWARE DESCRIPTION
60
DTR Digital Tap Changer Controller
GE—106305A
6.2 RECEPTION, HANDLING & STORAGE
DTR modules are supplied to the customer in a special package, which adequately protects it during transportation,
as long as this is performed in normal conditions. Immediately after receiving the equipment, the customer should
check whether it shows any signs of transportation damage. If it is apparent that the equipment has been damaged
by inappropriate handling, it must be immediately advised in writing to the carrier, and the damage must be reported
to the manufacturer
For unpacking the relay, normal care should be taken in order not to lose the screws, documents and other auxiliary
elements also supplied in the box.
If it is not intended to install the relay immediately, it is recommended to store it in its original package, and keep it in
a dry, dust free and metal particles free place.
6.3 INSTALLATION
DTR units must be mounted in vertical surface which allows access to the front and rear sides of the equipment. It is
not necessary to have access to the lateral surfaces of the equipment mounted. Dimensions and panel drilling for
boxes of a 19’’ rack 4 units high in shown in Figures 2 and 4.
7. ACCEPTANCE TESTS
In this section we will explain the different tests that allow verification of the complete functionality of a DTR protection
equipment. For a given DTR equipment, only those tests corresponding to the functions included in it should be
carried out, according to the table of application variables in the models selection guide.
7.1 VISUAL INSPECTION
•
Unpack the relay and make sure that there are no broken parts and that there are no signs that the relay has been
damaged during transportation
•
Make sure that all the screws are well tightened and the terminals blocks are not damaged.
•
Make sure that the device type indicated on the front plate matches with the order data.
7.2 INSULATION TEST
During the testing, the A12 terminal should be to connected to ground for security reasons. It must be verified that
connection to ground exists in the terminal C12.
- Apply gradually 2500 volts between all the terminals of a group, connected among themselves, and the box,
during a second.
7.3 POWER SUPPLY
Содержание DTR GEK-106305A
Страница 5: ...TABLE OF CONTENTS 4 DTR Digital Tap Changer Controller GE 106305A ...
Страница 49: ...4 PROGRAMMING THE UNIT 48 DTR Digital Tap Changer Controller GE 106305A ...
Страница 55: ...5 TECHNICAL CHARACTERISTICS 54 DTR Digital Tap Changer Controller GE 106305A ...
Страница 71: ...8 INSTALLATION AND MAINTENANCE 70 DTR Digital Tap Changer Controller GE 106305A ...
Страница 83: ...9 KEYPAD AND DISPLAY 82 DTR Digital Tap Changer Controller GE 106305A ...
Страница 87: ...FIGURES 86 DTR Digital Tap Changer Controller GE 106305A FIGURE 3 PANEL MOUNTING DIAGRAM ...
Страница 88: ...FIGURES GEK 106305A DTR Digital Tap Changer Controller 87 FIGURE 4 RS 232 CONNECTION ...
Страница 89: ...FIGURES 88 DTR Digital Tap Changer Controller GE 106305A FIGURE 5 DIMENSIONS DIAGRAM ...
Страница 90: ...FIGURES GEK 106305A DTR Digital Tap Changer Controller 89 FIGURE 6 FRONT VIEW ...
Страница 91: ...FIGURES 90 DTR Digital Tap Changer Controller GE 106305A FIGURE 8 GENERIC REAR VIEW ...