System Service Manual
−
SYSTEM COMPAX 40E, CE Marked
GE HEALTHCARE
with MPH 50/65/80 (including XT, RS 85 and Tomo
−
Link)
REV 9
DIRECTION 2154260
−
100
22
Step
Description
Done
Supporting Documents
ÍÍ
ÍÍ
Mark each box when done
From previous page
Í
Í
SYSTEM CONNECTIONS
POWER WIRING CONNECTIONS
2 People
See SM MPH: Dir 2137354
−
100
Chapter 1, Job Card IST002
MIS 3, 4, 6, 9, 11
MIS 1
−
1, 21, 3
−
1, 4
−
1, 5
−
1, 6
−
1, 7.1
Route Power and Ground cables
Connect cables onto MPH
POWER AND GROUND
CABLE CONNECTIONS
Continues on next page
SYSTEM WIRING CONNECTION
Route remaining System cables
MIS 1, 2, 6, 7, 8, 10, 12 to 23
NOTE: For connection of DOOR OPEN switch
and EXPOSURE ON signal lamp refer to Jov
Card IST004 of this manual
ÍÍ
ÍÍ
A21
A22
SYSTEM CABLES CONNECTION
REMARK:
Most of these cables are already factory
connected. See MIS MAP / MIS CHART of this
Manual (section 1
−
4)
.
Connections to be done during Installation:
REMARK:
Most of these cables are already factory
connected. See MIS MAP / MIS CHART of this
Manual (section 1
−
4)
.
Connections to be done during Installation:
See Job Card IST 005 for cable clamping
Refer to Inspection Report 2179651 TDR or
2172166 TDR or 2167647 TDR, section 1.2
2 People
A21
−
A22 = 4 Hours