System Service Manual
−
SYSTEM COMPAX 40E, CE Marked
GE HEALTHCARE
with MPH 50/65/80 (including XT, RS 85 and Tomo
−
Link)
REV 9
DIRECTION 2154260
−
100
25
Step
Description
Done
Supporting Documents
ÍÍ
ÍÍ
Mark each box when done
From previous page
Continues on next page
MPH CALIBRATION
A27
ÍÍ
ÍÍ
Make several exposures at different kV, mA
and mAs stations. Read Post Display on
MPH Console and if out of range, proceed
to step A28 otherwise, skip to step A29
REMARK: The MPH calibration is
performed at the factory but it is necessary
to re
−
check it.
NOTE: kV must be measured using a
Keithley 3508 kV pic meter.
Calibration Checks
kV, mA, mAs
OK
Yes
No
1 Person
1 Hour
A28
ÍÍ
ÍÍ
CALIBRATION
Run necessary
MPH Calibrations
1 Person
XX Hrs
Connect Service Terminal. Refer to the MPH
SM Dir. 2137354
−
100 Chapter 1 section 3
and proceed with calibrations in that section.
Refer to Inspection Report 2167647 TDR, or
2172166 TDR, section 2.2
−
2.3
Refer to Inspection Report 2167647 TDR or
2179651 TDR or 2172166 TDR.section 2.3
and proceed with required calibration
checks marked in grey:
Содержание Compax 40E
Страница 138: ......