System Service Manual
−
SYSTEM COMPAX 40E, CE Marked
GE HEALTHCARE
with MPH 50/65/80 (including XT, RS 85 and Tomo
−
Link)
REV 9
DIRECTION 2154260
−
100
14
1-2-3
Unpacking
Damage Due to Transport
On delivery of the equipment, all packages must be checked to make sure that they have not been
damaged during transport.
If damage is observed, notify the transport service and the factory transport insurance service
immediately.
The above also applies for
non apparent
damage due to transport discovered when unpacking the
material or during installation, WITHIN 14 DAYS MAXIMUM AFTER DELIVERY.
Generally, a transport service will
not
pay a bill for non
−
apparent damage unless an expert’s report has
been requested within 14 days of delivery.
If damage is discovered, contact the concerned services immediately, specifying the type of apparatus,
the serial number and the order number if possible, as well as a description of the damage.
Unpacking and Inspection
Tools required for unpacking:
−
a tool for removing nails, i.e. claw
−
hammer.
−
a crowbar (minimum length 600 mm).
−
a dolly for lifting and transporting the table base and SFD
−
fork, etc...
The components are wrapped in protective material and immobilized in the transport boxes. Each box is
numbered.
When unpacking, first find the packing list and check that all items are present. Check also that there is
no damage to the components received.
In case of missing parts, file a claim immediately mentioning the serial number of the unit as well as all
the shipping data.
Do not discard packing materials, such as envelopes or boxes, until all parts are accounted for.
−
Do not place equipment cabinets in areas that are damp, poorly ventilated, too far from the console,
or on another floor.
−
Avoid poor floor anchoring.
−
Ensure that the screws and washers of each cover are inside plastic bags stuck on the inside of the
cover.
Содержание Compax 40E
Страница 138: ......