GE H
EALTHCA
RE
D
IRECTI
ON
5141
177
-100, R
EVISIO
N
14
B
RI
G
H
T
S
PEED
E
LITE
, E
DGE
, E
XCEL
: P
RE
-I
N
STA
LLA
TION
Chapter
9 - Interconnection Data
Page 141
9 – Interconnects
Figure 9-3 System Interconnect Diagram (With TIO Console and IPC Board)
Gantry
RUN # 100
Control
RUN # 052
120/208Y Power
PDU
* Shields grounded with
clamp at gantry base.
J9
J1
TS2
TS3
TS5
Host
Computer
RUN # 102
LAN (RJ45)
RUN # 103
DAS Data (Fiber)
RUN # 101 Scan INTL (Interlock)
RUN # 053
Console Power
Console
Hospital Network
RUN # 104 Table IF
RUN # 054 120 VAC (bundle)
J28
Table
Footswitch
Footswitches
Power
Pan
IPC
System
Ground
Bus
Vault
Ground
Bulkhead
J11
TS1
TS2
A1J1
TGPU
RUN # 050
HVDC Power
RUN # 051
HVAC
Axial Mtr Power
*
*
Power
Pan
Bulkhead
Footswitch
Scan Display
Console Monitors
Power Cords
2142225
Monitor Cables
2256482
SCIM
Trackball
ICOM
Keyboard
RUN # 056
#2 Ground
RUN # 055
1/0 Ground
1/0 GND
#2 GND
rev. 09/04/27
J26
Footswitch
Mouse
Power Panel
Media Tower
Barcode Reader
InSite Modem
InSite Modem
MOD Tower
AW
G2
Ceiling
Item #8 51
16219
Item #10 2213219
Power
Video
Splitter
Out
Out
In
Item #2 2403438-3
Monitor
Item #16
2403438-4
In room Monitor
Signal
PANEL
Injector
Power
Respiratory
Monitor
EKG
Monitor
120VAC
2391751
120VAC
2391751-3
UPS
To A1 Pow
Disconnec
5169224
Foot SW
HHC
2355108
TS4
J27
GTCB
Signal
Signal
CDIP
Power
Power
Signal
Содержание BrightSpeed Elite
Страница 169: ...CT...
Страница 170: ...170 www gehealthcare com...