GE H
EALTHCARE
D
IRECTION
5141177-100, R
EVISION
14
B
RIGHT
S
PEED
E
LITE
, E
DGE
, E
XCEL
: P
RE
-I
NSTALLATION
Page 12
Revision History
12
10/11/10
Chapter 5
: Updated Figure 5-1 Equipment EMI “Envelopes”
Chapter 6
: Updated FLoor Levelness Requirement
Chapter 8
: Added Warning Message on Section 2.2 and 3.0
11
11/04/08
Chapter 3
: updated option list in Section 1.0
Chapter 4
: added new FWS Table (part 5168666) illustration in Section 6.4
Section 7.0 updated Injector AC power cable.
Section 8.0 updated Floor Levelness
Chapter 5
: Added the Notice for environmental requirement at beginning of Section 1.0
Section 1.1: Updated Temperature (Scan Room & Control Room) according to SRS
requirement.
Section 3.0: Updated Altitude values accroding to SRS requirement.
Section 4.0 updated Figure 5-1 of EMI requirement
Chapter 6
: updated floor loading specification in Section 1.0
added FWS seismic info in section 2.0
Chapter 8
, section 4.0: updated Figure 8-1 System Ground Map
Chapter 9
, section 3.0: updated System Interconnect Diagram
Section 3.4: updated table of GEMS Supplied Cables for Options
Section 5.0 Updated the Fuse Kit BOM
10
12/03/07
Important Precautions: updated content for Damage In Transportation
Chapter 4
: updated gantry width
Section 2.1.2 updated Regulated Minimum Working Clearance by Major Subsystem
Section 6.4 updated for FWS Seismic information
Added note to Section 8.4 Floor levelness
Added network specs to Section 9.0 Network Connections
Chapter 5
: Section 4.0 added note
Section 4.2 added EMI of color monitor
updated Figure 5-1 Sample Room Layout, showing approximate EMI requirements
Chapter 6
: updated gantry width
Chapter 9
: added LOTO requires to Section 7.1 Primary Power Disconnect
9
8/13/07
Updated measurements to metric to meet European standards and
compliance. General revision of manual.
Important Precautions: updated by adding Bulgarian warnings
Chapter 4
:
Added Section 8.7: Ceiling Requirement
Removed FWS extended cables Table to Chapter 9, Section 3.2
Chapter 5
: updated Section 2.0 Cooling Requirement
Chapter 7
:
Updated section 7.0/8.0/9.0 shipping considerations
Updated Section 6.0 System transportation temprature.
Chapter 9
: Updated Section 5.0 for Fuse Kit
8
6/28/07
Important Precautions: updated multi-langurage warnings
Chapter 4
: Added Section 4.0 for Short Footprint consideration
7
4/29/07
Chapter 8
: Updated Power Source Configuration
6
12/12/06
Chapter 3
: Updated option catalog numbers
Appendix
: Changed FCT to CT
Revision
Date
Reason for change
Содержание BrightSpeed Elite
Страница 169: ...CT...
Страница 170: ...170 www gehealthcare com...