GE H
EALTHCARE
D
IRECTION
5141177-100, R
EVISION
14
B
RIGHT
S
PEED
E
LITE
, E
DGE
, E
XCEL
: P
RE
-I
NSTALLATION
Page 110
Section 2.0 - Mounting Data, Including Seismic
Figure 6-6 Power Distribution Unit (NGPDU)
SERVICE AREA
MINIMUM AIR FLOW CLEARANCE
NOTES:
DIMENSIONS ARE IN INCHES (MILLIMETERS).
INDICATES CENTER OF GRAVITY
Current PDU Seismic Bracket has holes alreadly drilled.
Drill holes on the floor accordingly.
13.8
(350)
19.4
(494)
5.9
(150)
41.8
(1062)
27.6
(700)
35.4
(900)
21.7
(550)
9.3
(235)
4.9
(125)
14.2
(360)
SEISMIC
MOUNTING HOLES
SEISMIC FLOOR
MOUNTING HOLES
(not to scale; see note)
14.2
(360)
Содержание BrightSpeed Elite
Страница 169: ...CT...
Страница 170: ...170 www gehealthcare com...