Prepare inlets and outlets
Follow the instruction below to prepare the inlets and outlets that are to be used in the
method run.
Action
Step
Connect inlet and outlet tubing to the ports that are to be used.
1
Immerse all inlet tubing that is to be used during the method run in the
correct buffers.
2
Immerse the waste tubing from the Injection valve, the pH valve, the Outlet
valve, and the Fraction collector into a sufficiently large waste vessel (typically
2-10 liters).
3
Getting Started with ÄKTAavant and UNICORN 6 28-9440-69 AB
77
7 Prepare the system for a run
7.2 Prepare the flow path
Содержание AKTA avant
Страница 1: ...GE Healthcare Getting Started with KTAavant and UNICORN 6...
Страница 2: ......
Страница 133: ......