4.2.1 Planning the Installation Site
4.2.2 Receiving the Frequency Converter
4.2.3 Transportation and Unpacking
4.3.3 Terminal Locations - Unit Size 4X
4.3.4 Terminal Locations - Unit Size 5X
4.3.5 Terminal Locations - Unit Sizes 6X
4.3.7 Installation on the Wall - IP21 (NEMA 1) and IP54 (NEMA 12) Units
4.3.8 Gland/Conduit Entry - IP21 (NEMA 1) and IP54 (NEMA12)
4.3.9 IP21 Drip Shield Installation (Unit Sizes 41 and 42)
4.4 Field Installation of Options
4.4.1 Installation of Top-only Duct Cooling Kit
4.4.2 Installation of Top and Bottom Covers
4.4.3 Outside Installation /NEMA 3R Kit of Industrial Enclosures
4.4.4 Installation of IP00 to IP20 Kits
4.4.5 Installation of cable clamp bracket in open chassis drives.
4.4.6 Installation on Pedestal
4.4.7 Installation of Mains Shield for Frequency Converters
4.4.8 Unit Size 6x USB Extension Kit
4.4.9 Installation of 4x or 5x Loadshare Option
5 How to Operate the Frequency Converter
5.1.2 How to operate graphical keypad
Contents
AF-600 FP High Power Operating Instructions
2
Содержание AF-600 FP Series
Страница 44: ...Please note airflow directions Mechanical Installation AF 600 FP High Power Operating Instructions 43 4 4...
Страница 45: ...Please note airflow directions Mechanical Installation AF 600 FP High Power Operating Instructions 44 4 4...
Страница 46: ...Please note airflow directions Mechanical Installation AF 600 FP High Power Operating Instructions 45 4 4...