Page 4 - 10
Installation
Orca III/ Orca III T Operation and Maintenance Manual
© GBC Films Group February 2001
Figure 4.7.1 Single phase ( 3 wire )
B lu e W ires
R ed W ires
G ound
W ire
H ot Leg
H ot Leg
G rou nd
L 6 L 4 L 2
L 5
L 3
L 1
Figure 4.7.2 Delta three phase ( 4 wire )
Blue W ires
R ed W ires
G ound
W ire
H ot Leg
G round
H ot Leg
H ot Leg
Position
Jum per Bars
L 6 L 4 L 2
L 5
L 3
L 1
Jum per W ire
C ut here
T erminal
connecter
Jum per
Bar
Figure 4.7.3 Wye three phase ( 5 wire )
B lue W ire s
R ed W ires
G oun d
W ire
N eutral Leg
H ot Le g
G ro und
H ot Le g
H ot Le g
R emove
Jump er B ars
L 6 L 4 L 2
L 5
L 3
L 1
4.7.1 Preparation
a) Ensure the power at the junction box is in the
OFF position. Use a voltage meter to verify.
b) Open the control side cabinet by removing the
four hex button head screws with a 5/32 in. allen
wrench.
A1
A2
31
11
11
14
3
2
1
12
4
6
5
21
22
10
34
9
32
7
8
24
+
-
3
P
T
U
P
T
U
2
A1
A2
31
11
11
14
3
2
1
12
4
6
5
21
22
10
34
9
32
7
8
24
A1
A2
31
11
11
14
3
2
1
12
4
6
5
21
22
10
34
9
32
7
8
24
A1
A2
31
11
11
14
3
2
1
12
4
6
5
21
22
10
34
9
32
7
8
24
A1
A2
31
11
11
14
3
2
1
12
4
6
5
21
22
10
34
9
32
7
8
24
A1
A2
31
11
11
14
3
2
1
12
4
6
5
21
22
10
34
9
32
7
8
24
A1
A2
31
11
11
14
3
2
1
12
4
6
5
21
22
10
34
9
32
7
8
24
4
N
I
3
T
U
P
4
N
I
O
T
U
1
U
P
T
2
U
T
O
1
F+
P2
P3
I1
P1
L
1
F-
L2
A
+
A-
S tra in re lie f
B o lts
B lu e W ir es
R ed W ires
G o u n d
w ire
L 6
L 4
L 2
L 5
L 3
L 1
Ju m p er b ars
L in e te rm in a l b lo c k
c) Remove the power cable strain relief ( 175-201 )
from the accessory box and install it at the lower
rear hole of the control side cabinet.
d) Connect the power cord to the line terminal
block. Refer to the correct Figure for your
connection. Jumper bars may require removing
or cutting.