GC-IMS
– User Manual
117/214
5
Wait until cleaning
process is completed.
The process can be
stopped with
Skip
.
6
After all temperatures
reached the default
values inspect visually
the current spectrum and
compare it with the
reference spectrum of the
analytical approval.
The
RIP should reach ~80%
of the RIP height
displayed in the
delivered Analytical
Approval of the device
under same
measurement
conditions of G.A.S.
If not check the gas
quality and/or install
additional purification
cartridges and start the
cleaning procedure
again.
INFORMATION!
The device is delivered with an acceptance snapshot. This
snapshot defines the system performance during device
acceptance and is used to assess the readiness for measurement.
Any deviations from this are displayed in the Error Information
Window.
The default values can be adjusted by the customer
.
Содержание GC-IMS
Страница 1: ...User Manual GC IMS G A S Gesellschaft f r analytische Sensorsysteme mbH...
Страница 139: ...GC IMS User Manual 139 214 3 Wait until the exporting process is completed The measurement files has been downloaded...
Страница 150: ...GC IMS User Manual 150 214 4 Device without top cover...
Страница 157: ...GC IMS User Manual 157 214 3 Top view of installed sample pump unit 4 Remove the plug 5 Loosen front connector...
Страница 164: ...GC IMS User Manual 164 214 17 Tighten the three screws of the frontplate...
Страница 188: ...GC IMS User Manual 188 214 9 4 Technical drawing Internal Gasflow...
Страница 212: ...GC IMS User Manual 212 214 Tutorials VOCal Manuals VOCal...