13-17-618 Page 6
INDEX
Air Filter ............................................................ 55
Air Filter, Section 7 ........................................... 55
Air Flow In The Compressor System ................. 8
Air-Cooled Units, Location ............................... 15
Auxiliary Air Receiver ....................................... 17
Cold Weather Installation ................................. 17
Compression Principle ....................................... 8
Compressor Lubrication
– Separation, Filtration
And Controls, Section 5 ................................ 41
Control Piping ................................................... 17
Controls & Instrumentation, Section 4 ............. 28
Cooling, Sealing And Lubrication ....................... 9
Discharge Service Line .................................... 18
Electrical Wiring ............................................... 18
Enclosure ......................................................... 16
Filter Inspection ................................................ 69
Foundation ....................................................... 16
General Information, Section 1 .......................... 8
Grounding......................................................... 20
Heat Exchangers
Air-Cooled ..................................................... 51
Oil/Air ............................................................ 50
Water-Cooled ............................................... 52
Heat Exchangers (Oil, Air), Axial Cooling Fans,
Section 6 ....................................................... 50
Inlet Control Valve ............................................ 65
Inlet Control Valve, Section 10 ......................... 65
Inlet Line ........................................................... 17
Installation For Cold Cold Weather Operation . 17
Installation, Section 2 ....................................... 14
Lifting Unit ........................................................ 14
Location ............................................................ 14
Air-Cooled Units ........................................... 15
Water-Cooled Units ...................................... 15
Lubrication, Cooling And Sealing ....................... 9
Main Motor Grease Specifications ................... 70
Maintenance Schedule, Section 14 ................. 71
Minimum Pressure/Check Valve ...................... 63
Minimum Pressure/Check Valve, Section 9 ..... 63
Moisture Separator/Trap (Optional) ................. 17
Motor Lubrication ............................................. 70
Motor Lubrication ............................................. 20
Oil Filter ............................................................ 45
Oil Reservoir Drain........................................... 16
Oil System
Addition Of Oil Between Changes ................ 44
Compressor .................................................. 41
Draining And Cleaning ................................. 44
Filling Oil Reservoir ...................................... 45
Low Air Demand And Package Operation ... 46
Moisture ........................................................ 42
Oil Change Interval....................................... 44
Oil Filter ........................................................ 45
Oil Flow Control Valves ................................ 46
Oil Mixing Valve ............................................ 46
Oil Separation Reservoir/Coalescing Element
.................................................................. 47
Oil Sight Glass .............................................. 43
Oil Specifications .......................................... 41
Recommended Lubricant ............................. 41
Piping
Blow Down Valve ......................................... 18
Control .......................................................... 17
Water ............................................................ 18
Pressure Differential Gauging .......................... 48
Pressure Relief Valve ...................................... 67
Prestart-Up Instructions ................................... 21
Quick Start Guide............................................. 23
Safety Precautions ............................................. 4
Sealing, Lubrication And Cleaning ..................... 9
Service Check List ........................................... 71
Daily Checks ................................................ 71
Every 1000 Hours Operation ........................ 71
Every 3000 Hours Operation ........................ 71
Every 8000 Hours Operation ........................ 71
Weekly Checks ............................................. 71
Yearly ........................................................... 72
Shaft Coupling ................................................. 57
Shaft Coupling, Section 8 ................................ 57
Starting & Operating Procedures, Section 3 .... 21
Starting The Unit .............................................. 25
Stopping The Unit ............................................ 26
Troubleshooting, Section 15 ............................ 73
Ventilation Fans, Filters (Electrical Enclosure),
Section 12 .................................................... 69
Ventilation Fans/Filters .................................... 69
Warning
– Prohibition – Mandatory Label
Information ..................................................... 2
Water-Cooled Units, Location .......................... 15
Содержание VST55-90B
Страница 33: ...13 17 618 Page 32 4 5 Figure 4 2 PIPING AND INSTRUMENTATION ILLUSTRATION 300ETK797 C Ref Drawing ...
Страница 67: ...13 17 618 Page 66 9 2 Figure 9 1 MINIMUM DISCHARGE PRESSURE CHECK VALVE ...
Страница 81: ...NOTES ...
Страница 82: ...NOTES ...
Страница 83: ...NOTES ...