Chapter 5: Calibration
5-4
Figure 5-6
LPI Calibration Cell Connection message
Follow the instructions and connect all cables. Always verify that the output switch of the electronic
power supply or programmable power supply is turned
OFF
before installing the calibration cell. Remove
the safety enclosure by removing both thumb screw to access the PCB of the calibration cell. Connect the
power cables of the electronic load or programmable power supply to the studs. Slide the safety
enclosure back on and secure again. Connect the LPI Voltage Sense Cables to the banana connectors. Click
the
OK
button to continue.
Figure 5-7
LPI1010 200 mΩ Calibration Cell with connected cell leads
8)
In order to start the first calibration, the precise resistor value of the calibration cell needs to be entered.
You can find the resistor value on the side of your calibration cell. Press
OK
to continue.
Caution:
After attaching all cables to the calibration cell and before continuing with the
calibration, put the safety cover back on and secure it. Continuing without a cover and leaving the contacts
open is a severe safety hazard.
Содержание LPI1010
Страница 2: ...ii...
Страница 6: ......
Страница 14: ......
Страница 30: ...Chapter 4 Hardware Installation 4 10...
Страница 36: ......
Страница 62: ......
Страница 64: ......
Страница 66: ......
Страница 67: ...Appendix D Certificate of conformity Appendix D VII Certificate of conformity...
Страница 68: ...Appendix D Certificate of conformity Appendix D VIII...