Chapter 3: Installation
3-1
Chapter 3:
Installation
This chapter of the Gamry Instruments Inc. Load/Power Supply Interface (LPI1010) High Voltage EIS Test System
covers normal installation of the LPI1010. We assume the LPI1010 system is installed as part of a Gamry
Instruments’ Framework-based electrochemical measurement system containing a Microsoft Windows
®
-
compatible computer.
Initial Visual Inspection
After you remove your LPI1010 from its shipping carton, check it for any signs of shipping damage. If you observe
any damage, please notify Gamry Instruments, Inc. and the shipping carrier immediately. Save the shipping
container for possible inspection by the carrier.
Verify that all parts listed on the packing list are included. Be sure you have the correct version of your LPI1010.
Compare the packing list with the label on the D-sub Module and Cable End Module. Below are the variants of the
LPI1010, each with a different input voltage range:
Part #
Name
Voltage Range
992-00155
LPI1010 Load/Power Supply Interface 10V
10 V full-scale
992-00156
LPI1010 Load/Power Supply Interface 100V
100 V full-scale
992-00157
LPI1010 Load/Power Supply Interface 1kV
1 kV full-scale
Figure 3-1
Overview of the LPI1010 Top-Level Assembly
Warning:
If the LPI1010 is taken from a cold location (for example outdoors in winter
conditions) to a warm, humid location, water vapor may condense on the cold surfaces inside the LPI1010,
possibly creating a hazardous condition. Before connecting power to a “cold” LPI1010, allow at least one hour
to warm at room temperature.
Содержание LPI1010
Страница 2: ...ii...
Страница 6: ......
Страница 14: ......
Страница 30: ...Chapter 4 Hardware Installation 4 10...
Страница 36: ......
Страница 62: ......
Страница 64: ......
Страница 66: ......
Страница 67: ...Appendix D Certificate of conformity Appendix D VII Certificate of conformity...
Страница 68: ...Appendix D Certificate of conformity Appendix D VIII...