Revision 4
62
12/15/2018
The following example shows how the system determines if a peak is a valid peak:
The peak for iso-Butane is expected at 70.405sec. ± 5.000 sec. as defined by the component
table.
The
Skimming Peak Start and Skimming Peak End
parameters are 69.2 seconds and 71.8
seconds. This means that the apex of the peak is expected to occur between these two
times.
The
Skimming Peak Leading Edge Start
and
Skimming Peak Leading Edge Stop
parameters
are 3.6 and 1.3 seconds. This means that the start of the peak integration will occur between
70.405 seconds minus 3.6 seconds (66.804) and 70.405 seconds minus 1.3 seconds
(69.105). The start of the peak is defined as the minimum value of the detector signal
between these two points. The
Skimming Peak Leading Edge Start
and
Skimming Peak
Leading Edge Stop
times are defined relative to the retention time so that the peak
integration start time will move with the peak if the retention time of the peak shifts
.
The
Skimming Peak Trailing Edge Start
and
Skimming Peak Trailing Edge Stop
parameters
are 1.3 and 5.5 seconds. This means that the end of the peak integration will occur between
70.405 seconds plus 1.3 seconds (71.705) and 70.405 seconds plus 5.5 seconds (75.905).
The end of the peak is defined as the minimum value of the detector signal between these
two points. The
Skimming Peak Trailing Edge Start
and
Skimming Peak Trailing Edge Stop
times are defined relative to the retention time so that the peak integration end time will move
with the peak if the retention time of the peak shifts.
Figure 5-5: Definition of a Peak
Savitsky Golay Window
– This is a smoothing factor for the chromatogram and should not be
altered.
The following columns are to the right of the parameters for the fitting
approach.
Содержание AccuChrome MA2963
Страница 21: ...Revision 4 8 12 15 2018 Figure 2 7 The Intrinsically Safe Barrier ...
Страница 24: ...Revision 4 11 12 15 2018 Figure 2 10 4 Minute Analysis Flow Diagram ...
Страница 26: ...Revision 4 13 12 15 2018 Figure 3 1 Physical Dimensions Class 1 Div 2 ACCUCHROME Chromatograph ...
Страница 58: ...Revision 4 45 12 15 2018 Figure 4 24 Chart Commands ...
Страница 65: ...Revision 4 52 12 15 2018 A sample report is shown in Figure 4 32 Figure 4 32 Sample Report ...
Страница 80: ...Revision 4 67 12 15 2018 Figure 5 10 Streams Setup ...
Страница 104: ...Revision 4 91 12 15 2018 Figure 8 2 Enron Mode Short Integers ...
Страница 114: ...Revision 4 101 12 15 2018 SS 2F LE MICRON INLINE FILTER HOUSING SS 2F K4 7 7 MICRON INLINE FILTER ELEMENT ...
Страница 124: ...Revision 4 111 12 15 2018 Figure 12 1 PLGC Power Connections Figure 12 2 Relays Wiring Diagram ...
Страница 125: ...Revision 4 112 12 15 2018 Figure 12 3 Analog Outputs Loop Powered Mode Figure 12 4 Analog Outputs Self Powered Mode ...
Страница 126: ...Revision 4 113 12 15 2018 Figure 12 5 Isolated RS 485 Port Connection Figure 12 6 Isolated RS 232 Connections ...
Страница 129: ...Revision 4 116 12 15 2018 Figure 12 11 Oven RTD and TCD Connections Figure 12 12 Arcnet AC485 Twisted Pair Connection ...
Страница 130: ...Revision 4 117 12 15 2018 Figure 12 13 Oven Heater Connection Figure 12 14 GC Valves Connections ...
Страница 131: ...Revision 4 118 12 15 2018 Figure 12 15 Solenoids 5 to 10 Connections Figure 12 16 Solenoids 1 to 4 Connections ...
Страница 132: ...Revision 4 119 12 15 2018 Figure 12 17 Digital Inputs Connections Figure 12 18 Cabinet Heater Connection ...
Страница 139: ...Revision 4 126 12 15 2018 Section 15 Valco 6 and 10 Port Valve Technical Information 15 1 Valve Operation Instructions ...
Страница 140: ...Revision 4 127 12 15 2018 ...
Страница 141: ...Revision 4 128 12 15 2018 15 2 Valve Maintenance Instructions ...
Страница 142: ...Revision 4 129 12 15 2018 ...