2.4.3 Connection of the AC Power Service
The conduit connections for the AC power cable(s) are at the bottom of the analyzer system,
slightly to the right of the centreline, as indicated in Figure 4. The LIVE / HOT power lead is
connected to the AC Terminal Strip (ACTS) Terminal 25, the NEUTRAL power lead is
connected to ACTS:2, and the GROUND lead is connected to ACTS:21. The ACTS is
located at the bottom left of the inside of the control cabinet, as shown in Figure 8. The fused
terminals can be opened by lifting the tab.
Figure 8: Location of ACTS in Control Cabinet
Installation of the conduit, wiring, and disconnect deices must comply with all
applicable, national, local, and company electrical codes. All connections must
be ‘sealed’.
DO NOT energize the AC power supply to the analyzer at this time. The analyzer
system will be powered up at the time of commissioning by Galvanic Applied
Sciences Inc. personnel.
2.4.4 Connection of the Analog Signal Cables
The conduit connector for the Analog Signals, with the label ‘Analog Signals’, is provided on
the bottom right side of the analyzer system control cabinet, towards the front of the cabinet,
as indicated in Figure 3. There is a total of four
analog output
signal terminals available on
the
Input / Output (IO) Board
inside the control cabinet, in the location indicated in Figure
9.
Содержание 943-TGXeNA
Страница 130: ...Revision 5 130 August 2021 Figure 82 Oven Cabinet Door Removed ...
Страница 131: ...Revision 5 131 August 2021 Figure 83 Control Cabinet Door Removed ...
Страница 132: ...Revision 5 132 August 2021 Figure 84 Power Steam Air Signals Connection Details ...
Страница 133: ...Revision 5 133 August 2021 Figure 85 AC Wiring Schematic ...
Страница 134: ...Revision 5 134 August 2021 Figure 86 DC Signals and Wiring Diagram ...
Страница 135: ...Revision 5 135 August 2021 Figure 87 Flow Diagram ...