Revision 5
22
August 2021
2.4.1 Mounting of the Analyzer System
The framework that is used in the analyzer system must be securely attached to a support
structure provided by the end user. The support structure must be positioned so that when
the analyzer framework is bolted in place, the flange of the analyzer cabinet and the process
sample access point are correctly aligned. The plant support structure should be suitable for
mounting the analyzer frame as shown in the Mounting Dimensions drawing given in Figure
2.
Figure 2: Mounting Dimensions
The steam jacketed ball valve must be installed on the process sample point
before mounting the analyzer system. The Steam jacketed ball valve must remain
closed until the sample probe is installed and connected in the sample handling
oven.
Figure 3 indicates the location of the various connections that must be made.
Содержание 943-TGXeNA
Страница 130: ...Revision 5 130 August 2021 Figure 82 Oven Cabinet Door Removed ...
Страница 131: ...Revision 5 131 August 2021 Figure 83 Control Cabinet Door Removed ...
Страница 132: ...Revision 5 132 August 2021 Figure 84 Power Steam Air Signals Connection Details ...
Страница 133: ...Revision 5 133 August 2021 Figure 85 AC Wiring Schematic ...
Страница 134: ...Revision 5 134 August 2021 Figure 86 DC Signals and Wiring Diagram ...
Страница 135: ...Revision 5 135 August 2021 Figure 87 Flow Diagram ...