Step 8: Install Top Flashing Underlayment and Complete Shingles
Follow the sequence below to complete this step.
Step 8a: Install the QuickStart® Starter Roll over the Top Corner Flashing...
Install a strip of
QuickStart® Peel and Stick Starter Roll over each the Top Corner Flashing as shown in
Figure
59
. Notch as needed.
Figure 59 Apply QuickStart® Peel and Stick Over the Top Corner Flashing
Step 8b: Install Shingles over the Top Corner Flashing…
Install the shingles over the Top Corner
Flashing. Notch as needed as shown in
Figure 60
.
Figure 60 Install Shingles over Top Corner Flashing
NOTE
Protect the wires from abrasion on the shingles and other physical damage until the installation is
complete.
Step 8c:
Install the Leak Barrier over the Top Flashing…
Install StormGuard® Leak Barrier over the
nailing area of the Top Flashing. The Leak Barrier should cover the headlap of the adjacent
row of shingles and extend past the array approximately 3 feet (914 mm) (
Figure 61
).
Step 8a: Install the
QuickStart® Starter Roll
Over the Top Corner
Flashing
Step 8b: Install
Shingles Over the
Top Corner
Flashing
Step 8c: Install
Leak Barrier Over
the Top Flashing
Step 8d: Install
QuickStart®
Starter Roll Over
the Leak Barrier
Step 8e: Install
Remaining Rows
of Shingles
Top Corner
Flashing
QuickStart® Peel and
Stick Starter Roll.
Notch the Shingle
as needed
Содержание DecoTech
Страница 1: ...P a g e 1 FF GAF Solar Energy System 2019 GAF All Rights Reserved Version 3 1 08 2019 ...
Страница 40: ...P a g e 40 Peel the MLPE Bar Code Affix the Bar Code to the MLPE Map Figure 43 Create MLPE Map ...
Страница 55: ...P a g e 55 SECTION 7 APPENDIX GAF Solar Module Technical Data Table 4 Solaria Laminate Specifications ...
Страница 56: ...P a g e 56 Table 5 Silfab Laminate Specifications ...