![GAF DecoTech Скачать руководство пользователя страница 53](http://html.mh-extra.com/html/gaf/decotech/decotech_installation-instructions-manual_555829053.webp)
P a g e
|
53
The installing contractor must ensure that none of the wiring comes in contact with any of the Side
Flashing. Use wire ties wherever necessary and route the wires through the gaps between the
Adjustable Feet for proper wire management (
Figure 67
). The minimum clearance between the
wires and Side Flashing is 2 inches (51 mm). Always obey the cables’ minimum bend radius.
Figure 67 Typical Wire Management
Detail B
Detail A
Detail B
Detail A
Side Flashing (Step
Flashing & Counter
Flashing)
MLPE
Содержание DecoTech
Страница 1: ...P a g e 1 FF GAF Solar Energy System 2019 GAF All Rights Reserved Version 3 1 08 2019 ...
Страница 40: ...P a g e 40 Peel the MLPE Bar Code Affix the Bar Code to the MLPE Map Figure 43 Create MLPE Map ...
Страница 55: ...P a g e 55 SECTION 7 APPENDIX GAF Solar Module Technical Data Table 4 Solaria Laminate Specifications ...
Страница 56: ...P a g e 56 Table 5 Silfab Laminate Specifications ...