![GAF DecoTech Скачать руководство пользователя страница 44](http://html.mh-extra.com/html/gaf/decotech/decotech_installation-instructions-manual_555829044.webp)
P a g e
|
44
Step 7: Install Top Flashing
Follow the sequence below to complete this step.
Step 7a: Install the Top Flashing Frame Inserts…
The Top Flashing Frame Insert snaps onto the top
edge of the Solar Module Assembly as shown in
Figure 50
. Verify that every tab is engaged by
pulling back on the Frame Insert. Install one Frame Insert for each Solar Module Assembly
along the top row.
Figure 50 Install Top Flashing Frame Insert
Step 7b: Install the Top Flashing Supports and Position the DynoBond™ Jumpers…
Place Top Flashing
Supports at the corners of the array and at every module-to-module joint. It is important to
place the corner Top Flashing Supports 1/4"-1/2" (6-12 mm) from the edge of the
Counterflashing as shown in
Figure 51
. The remaining Top Flashing Supports must be
centered on the joint between the Solar Module Assemblies. Each support should be fastened
to the deck with two standard roofing nails within 1 inch (25 mm) of the edge. See
Figure 51
.
Step 7a: Install the Top Flashing Frame Insert
Step 7b: Install the Top
Flashing Supports and
DynoBond™ Jumpers
Step 7c: Position the Top
Flashing
Step 7d: Install the Grounding Clips
on the Top Flashing
Step7e: Nail the Top Flashing in
Place
Step 7f: Install the Top Corner
Flashing
Top Flashing Frame Insert
Содержание DecoTech
Страница 1: ...P a g e 1 FF GAF Solar Energy System 2019 GAF All Rights Reserved Version 3 1 08 2019 ...
Страница 40: ...P a g e 40 Peel the MLPE Bar Code Affix the Bar Code to the MLPE Map Figure 43 Create MLPE Map ...
Страница 55: ...P a g e 55 SECTION 7 APPENDIX GAF Solar Module Technical Data Table 4 Solaria Laminate Specifications ...
Страница 56: ...P a g e 56 Table 5 Silfab Laminate Specifications ...