P a g e
|
36
Step 4: Install the First Row of Solar Module Assemblies
Follow the sequence below to complete this step.
Step 4a:
Mount the Solar Module Assemblies onto the Starter Bar...
Place the Solar Module
Assemblies into the Starter Bars from left to right. Holding the Solar Module Assembly at ~15°
angle, slide it downward until it hooks into the starter bar (Figure 35).
Align the first Solar Module Assembly with left edge of the Starter bar. Place the next Solar
Module Assembly into the Starter Bar a few inches to the right of the first Solar Module
Assembly. Slide it to the left until it interlocks with the first Solar Module Assembly (Figure
36). Repeat these steps from left to right until the row is complete.
Step 4a: Mount the Solar Module
Assemblies onto the Starter Bar
Step 4b: Make
Electrical Connections
Between MLPEs
Step 4c: Attach the
Solar Module
Assemblies to the
Deck
Step 4d: Install
Grounding
Step 4e: Create the
MLPE Map
Starter Bar
Solar Module
Assembly
Figure 35 Mount Solar Module Assembly onto the Starter Bar
Figure 36 Placing and Aligning Solar Module Assemblies
Содержание DecoTech
Страница 1: ...P a g e 1 FF GAF Solar Energy System 2019 GAF All Rights Reserved Version 3 1 08 2019 ...
Страница 40: ...P a g e 40 Peel the MLPE Bar Code Affix the Bar Code to the MLPE Map Figure 43 Create MLPE Map ...
Страница 55: ...P a g e 55 SECTION 7 APPENDIX GAF Solar Module Technical Data Table 4 Solaria Laminate Specifications ...
Страница 56: ...P a g e 56 Table 5 Silfab Laminate Specifications ...