Step 3: Install the Starter Bar
Follow the sequence below to complete this step.
Step 3a:
Snap Chalk Line…
Snap a chalk line 5.25 inches (133 mm) from the edge of the shingle
exposure line (
Figure 32
).
Step 3b: Position and Attach the Starter Bars...
Align the top edge of the feet of the Starter Bars with
the chalk line as shown in
Figure 32
. Each Foot has two rows of three pre-drilled screw holes.
Use either row of screw holes to avoid seams and knots in the roof deck. Fasten the starter
bar to the deck using #14 – 1-1/2" (37.5 mm) Panel-Tite™ Roofing Fasteners (
Figure 33
). Do
not overtighten the roofing fasteners.
Figure 33 Attach the Starter Bar to the deck
Step 3a: Snap Chalk Line
Step 3b: Position and Attach the Starter Bars to
the Deck
Panel-Tite
™
Roofing Fasteners
(x3)
5.25"
Align the
Mounting
Foot with the
Chalk Line.
Figure 32 Position the first Starter Bar
Содержание DecoTech
Страница 1: ...P a g e 1 FF GAF Solar Energy System 2019 GAF All Rights Reserved Version 3 1 08 2019 ...
Страница 40: ...P a g e 40 Peel the MLPE Bar Code Affix the Bar Code to the MLPE Map Figure 43 Create MLPE Map ...
Страница 55: ...P a g e 55 SECTION 7 APPENDIX GAF Solar Module Technical Data Table 4 Solaria Laminate Specifications ...
Страница 56: ...P a g e 56 Table 5 Silfab Laminate Specifications ...