Note
Because adjacent Starter Bars are spliced together using a common Foot Base, it is typically easier to
assemble all of the Starter Bars together before attaching them to the deck. This allows the entire
row to be aligned at once (
Figure 34
).
Figure 34 Row of Starter Bars
Stretch a mason line along the top edge of the Start Bars to verify that everything is at the
same height (
Figure 37
). Adjust the feet as necessary (
Figure 38
).
Starter Bars
Gap
Adjacent Starter
Bars share Foot
Base