M
CB
3
Installation Manual
Page 16
General Installation
System Wiring
Cables are generally shipped at a predetermined length required for a particular machine. Connectors
are installed at the factory.
Plan the routing of all cables prior to actual installation. Some machines may require cutting a
hole in the sheet metal with a hole saw to route the cable. Be sure not to drill into harnesses or other
components. Grind or file any sharp edges and add edge grommet or wire loom to protect the cables.
All cables should be attached to the machine at a minimum of every 2 to 3 feet (.6 to 1.0 meter)
or less to try to eliminate cable movement and possible abrasion damage. Special care should be
taken at flex points to ensure the cable moves freely and does not rub on other hoses, fittings, or
the machine. Provide adequate cable length to avoid pinching, stretching, and tight bending. Also,
cables should not be clamped to pipes or hoses that will cause the cable to be exposed to high
temperatures.
Power Cable:
Connect the 4-socket connector on the power cable to the 4-pin connector on the box. Route the
cable to the machine's battery and connect the terminal ends to the battery. The red terminal is for the
positive post and the black is for ground. The box has reverse polarity protection in case the terminals
are connected improperly.
NOTE:
In order to utilize the machine's master disconnect, the ground wire must be
connected to the machine frame.
Receiver Cable:
A dual receiver cable connects the control box with a dual connector junction block that supports two
laser receivers. Two separate cables connect the junction block to the receivers.
The junction block can be mounted on the front of the machine with the provided 1/4 inch hardware.
Once the junction block mounting is determined, route the cable through the machine to the control
box. Connect the cable 7-pin connector to the 7-socket connector on the control box.
The junction block is marked "L" for left side and "R" for right side as the operator is looking forward
in the direction of machine travel.
Connect the receiver straight cable or coil cord 7-pin connector to the 7-socket connector on the junction
block for each side. Connect the cable's 7-socket connector to the 7-pin connector on the bottom of
the
MCR
receiver for each side.
Attach dust caps to connectors when not in use.
4.3
Dual Receiver Cable - Hood Mounting
Lay block on its side with bolt holes vertical. Mount to top of
hood with provided hardware.
Alternatively, the junction block may be mounted to the grill
(possibly with minor grill modifications) and user provided
hardware.
Содержание MCB3
Страница 1: ...MCB3 CONTROL BOX Installation Manual Technical Information Software Version 3 00 P N ATI 026046 Rev C...
Страница 57: ...MCB3 Installation Manual Page 55 NOTES...
Страница 58: ...MCB3 Installation Manual Page 56 NOTES...
Страница 59: ...Page 57 NOTES MCB3 Installation Manual...
Страница 60: ...Futtura Tools Technologies Inc 100 N Rockwell Ste 96 Oklahoma City OK 73127 USA...