![Furukawa electric S153 Ver.2 Скачать руководство пользователя страница 51](http://html.mh-extra.com/html/furukawa-electric/s153-ver-2/s153-ver-2_user-manual_2349542051.webp)
Basic Operation
6-1
6. Basic Operation
6.1. Preparations for Power supply
6.1.1.
Installing Battery
!
CAUTION
・
Turn off the power before doing any operation.
・
Do not drop the battery during the installing or
removing operation.
If the battery level indicator on the right upper corner is flashing, it
means the battery is running out. Please swiftly plug the power cable
and start the charge process.
Содержание S153 Ver.2
Страница 2: ......
Страница 8: ......
Страница 22: ......
Страница 28: ......
Страница 40: ...External Description 5 2 Electrode V Groove Fiber Holder Fiber Clamp ...
Страница 49: ...External Description 5 11 Function Menu Function Keys Press to select the corresponding Function Menu ...
Страница 50: ......
Страница 99: ...Programming Guide 8 21 Time chart of heater parameters ...
Страница 152: ......
Страница 158: ...Option 10 6 10 4 Cleaning Brush VGC 01 It is used to remove the garbage that adheres to V groove and the fiber clamp ...
Страница 163: ...Recycling and Disposal For sales and service information contact FURUKAWA ELECTRIC CO LTD or your local representative ...