Getting Started
3-1
3. Getting Started
3.1. Unpacking and Initial Inspection
1. Inspect the shipping container for any indication of excessive shock to the contents.
2. Remove the S153 Ver.2 carrying case from the shipping container, and open the case.
Ensure that the carrying case is right side up before opening.(It applies in the package form
with the carrying case.)
3. Inspect the contents to ensure that the shipment is complete.
4. Place the S153 Ver.2 fusion splicer on a flat, smooth surface.
5. Visually inspect the S153 Ver.2 fusion splicer and all accompanying components for
structural damage that may have occurred during shipping.
Immediately inform Furukawa Electric and the carrier, if the contents of the shipment are
incomplete, or if any of the S153 Ver.2 fusion splicer components are damaged/defective, or if
the S153 Ver.2 fusion splicer does not pass the initial inspection.
♦
Protection sheet is pasted on the surface of LCD cover, the surface of the switch panel,
and the surface of the label. Please peel off before using S153 Ver.2.
Содержание S153 Ver.2
Страница 2: ......
Страница 8: ......
Страница 22: ......
Страница 28: ......
Страница 40: ...External Description 5 2 Electrode V Groove Fiber Holder Fiber Clamp ...
Страница 49: ...External Description 5 11 Function Menu Function Keys Press to select the corresponding Function Menu ...
Страница 50: ......
Страница 99: ...Programming Guide 8 21 Time chart of heater parameters ...
Страница 152: ......
Страница 158: ...Option 10 6 10 4 Cleaning Brush VGC 01 It is used to remove the garbage that adheres to V groove and the fiber clamp ...
Страница 163: ...Recycling and Disposal For sales and service information contact FURUKAWA ELECTRIC CO LTD or your local representative ...