![Furukawa electric S124 Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/furukawa-electric/s124/s124_user-manual_2349549026.webp)
25
5. Basic Operation
5.1 Preparations for Power Supply
5.1.1 Connecting the power cable to the AC the adapter
Connect the AC adapter to the DC
Power port of the Splicer, and plug
the AC adaptor into an AC outlet.
5.1.2 Charging the Battery
After connecting the power cable to the AC adapter and plugging the
power cable into the AC outlet, the charging process starts.
(When splicing and heating, the charging process stops temporarily, due to
this the charging time will take longer. Charging is recommended when
powered-off.)
AC Adapter
Charge
Icon
Charge
LED
Содержание S124
Страница 1: ...FTS B557 01 S124 FUSION SPLICER USER MANUAL Issue 1...
Страница 73: ...72...
Страница 108: ...107...