
13
3. Getting Started
3.1 Unpacking and Initial Inspection
1.
Inspect the shipping container for any indication of excessive shock to
the contents.
2.
Remove the NJ001 carrying case from the shipping container, and open
the case.
3.
Ensure that the carrying case is right side up before opening. (It applies
in the package form with the carrying case.)
4.
Inspect the contents to ensure that the shipment is complete.
5.
Lift the NJ001 fusion splicer out of the carrying case, and place the
instrument on a flat, smooth surface.
6.
Visually inspect the NJ001 fusion splicer and all accompanying
components for structural damage that may have occurred during
shipping.
Immediately inform Furukawa Electric and the carrier, if the contents of the
shipment are incomplete, or if any of the NJ001 fusion splicer components
are damaged, defective, or if the NJ001 fusion splicer does not pass the
initial inspection.
Protection sheet is pasted on the surface of LCD cover, the surface of the
switch panel, and the surface of the label. Please peel off before using
NJ001.
WARNING
To avoid electrical shock, do not initialize or operate the NJ001
fusion splicer if it bears any sign of damage to any portion of its
exterior surface, such as the outer cover or panels.