© Fulton Group N.A., Inc. 2022
4-2
MAINTENANCE & TROUBLESHOOTING
VSRT-IOM-2022-0728
SECTION 4
!
WARNING
Prior to the commencement of any work
requiring the removal of cover plates and
the opening of the control panel box, the
electrical supply to the boiler must be
disconnected.
Proper lockout / tagout procedures must
be employed when servicing this unit.
Hazard analysis should be performed
by end user to ensure safety of their
employees and/or service technicians.
Qualified and knowledgeable personnel
should perform all weekly, monthly and
annual maintenance checks.
Label all wires prior to disconnecting
when servicing controls. Wiring errors can
cause improper and dangerous operation.
4
CAUTION
Verify proper operation after servicing.
To ensure the continued safety and
efficiency of the boiler, you must adhere to
the schedule of maintenance outlined in this
section.
Installation and service must be performed
by a qualified and knowledgeable
individual, such as a Fulton representative,
qualified installer, service agency or gas
supplier. Any potential warranty issues that
arise after an unqualified individual has
manipulated boiler parameters will not be
considered.
4
CAUTION
If the feed water is being treated by chemical
compounds, make sure that this treatment
is carried out carefully and according to the
supplier’s instructions.
Procedure for Cleaning Water Probes
1. To clean probe in the boiler shell and probes in water column:
2. Make sure there is no pressure in the boiler during the removal of the
probes.
3. Remove one probe (using a 7/8” socket), clean with ver
y fine emory cloth
and replace it before removing another to assure no probe mix-ups that
would change the control functions. For replacement purposes, installed
probe lengths are indicated in
Figure 34
. For a universally adaptable plug
and probe which can be cut to length in the field to fit all boilers, order Part
No. 2-20-017.
VSRT-9.5
VSRT-10/15 VSRT-20/30 VSRT-40-60
VSRT-80
VSRT-100
through 250
ALWCO
2-20-000023 2-20-000290 2-20-000290 2-20-000290 2-20-000009
2-20-000009
Pump O
ff
Probe
2-10-000010 2-10-000010 2-10-000010 2-10-000010 2-10-000010
2-10-000010
Pump On
Probe
2-10-000011 2-10-000011 2-10-000011 2-10-000011 2-10-000011
2-10-000011
Low
Water
Probe
2-10-000106 2-10-000106 2-10-000106 2-10-000106 2-10-000106
2-10-000106
High
Water
2-20-000009 2-20-000009 2-20-000009 2-20-000009 2-20-000009
2-20-000009
Probe
Assembly
3-50-000702 3-50-000702 3-50-000702 3-50-000702 3-50-000702
3-50-000702
Part Number
Length
2-20-000023
3"
2-20-000009
4"
2-20-000290
19"
2-10-000010
7.25"
2-10-000011
9.25"
2-10-000106
10.5"
Содержание VSRT Series
Страница 2: ......
Страница 84: ... FultonGroupN A 2022 OPERATION VSRT IOM 2022 0728 SECTION3 3 20 THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 102: ... FultonGroupN A Inc 2022 MAINTENANCE TROUBLESHOOTING VSRT IOM 2022 0728 SECTION4 4 18 PAGE LEFT INTENTIONALLY BLANK ...
Страница 115: ...Questions PleaseContactYourLocalManufacturer sRepresentative SECTION5 VSRT IOM 2022 0728 SERVICEDOCUMENTS 5 13 NOTES ...
Страница 116: ... FultonGroupN A 2022 SERVICEDOCUMENTS VSRT IOM 2022 0728 SECTION5 5 14 NOTES ...
Страница 117: ...Questions PleaseContactYourLocalManufacturer sRepresentative SECTION5 VSRT IOM 2022 0728 SERVICEDOCUMENTS 5 15 NOTES ...