
Questions? Please Contact Your Local Manufacturer’s Representative
SECTION 5
VSRT-IOM-2022-0728
SERVICE DOCUMENTS
5-3
START-UP: INSTALLATION & OPERATION REPORT
FOR FULTON STEAM BOILERS
PAGE 2 OF 9
BLOW DOWN TANK
VENT CONNECTION
FREE TO ATMOSPHERE
TERMINATED
TO
A
SAFE
AREA
SAME
SIZE
AS
TANK
OUTLET
COOLING
KIT
INSTALLED
DRAIN OUTLET RUN FULL SIZE AND IN PROPER MATERIAL TO SUITABLE DRAIN
FEED WATER TANK
PUMP QUANTITY
PUMP 1
PUMP 2
PUMP MAKE & MODEL
PUMP MOTOR HORSEPOWER
PUMP MOTOR VOLTAGE
PUMP MOTOR FULL LOAD AMPERAGE
PUMP MOTOR EFFICIENCY
PUMP POWER FACTOR
PUMP ROTATION IS CORRECT
PUMP IS BLED AND PRIMED
ISOLATION VALVE IS INSTALLED, PUMP IS SERVICEABLE
PUMP HAS RECIRCULATION LINE FOR DEAD HEAD PROTECTION IF CONTINUOUS RUN
RETURN TANK
SIZE OF RETURN TANK
MAKEUP WATER SUPPLY PRESSURE
VENT CONNECTION
FREE TO ATMOSPHERE
TERMINATED
TO
SAFE
AREA
SAME
SIZE
AS
TANK
OUTLET
LEVEL CONTROLS ARE INSTALLED CORRECTLY
PREHEAT KIT INSTALLED & STEAM PRESSURE SUPPLIED
DEAERATOR TANK
SAFETY VALVE IS PIPED TO SAFE LOCATION
SAFETY VALVE HAS A MEANS TO PREVENT CONDENSATE FROM RETURNING TO THE VALVE
VENT CONNECTION
FREE TO ATMOSPHERE
PREVENTS
CONTAMINATION
VENTED
TO
A
SAFE
LOCATION
SAME
SIZE
AS
TANK
OUTLET
SAFETY VALVE IS PRESENT AND SIZED PROPERLY
SAFETY VALVE IS PIPED TO SAFE LOCATION
VENT CONNECTION HAS A MEANS TO PREVENT CONDENSATE FROM RETURNING TO THE VALVE
Содержание VSRT Series
Страница 2: ......
Страница 84: ... FultonGroupN A 2022 OPERATION VSRT IOM 2022 0728 SECTION3 3 20 THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 102: ... FultonGroupN A Inc 2022 MAINTENANCE TROUBLESHOOTING VSRT IOM 2022 0728 SECTION4 4 18 PAGE LEFT INTENTIONALLY BLANK ...
Страница 115: ...Questions PleaseContactYourLocalManufacturer sRepresentative SECTION5 VSRT IOM 2022 0728 SERVICEDOCUMENTS 5 13 NOTES ...
Страница 116: ... FultonGroupN A 2022 SERVICEDOCUMENTS VSRT IOM 2022 0728 SECTION5 5 14 NOTES ...
Страница 117: ...Questions PleaseContactYourLocalManufacturer sRepresentative SECTION5 VSRT IOM 2022 0728 SERVICEDOCUMENTS 5 15 NOTES ...