INSTALLATION
VSRT-IOM-2022-0728
SECTION 2
2-50
MIN 4FT
( 122 CM )
APPROVED EXHAUST
VENT MATERIAL
MIN 4FT / 122 CM
ABOVE AIR
INTAKE PIPING
SCREENED INLET
EXHAUST OUTLET
IF SNOW ACCUMULATION
IS APPLICABLE, OPENING TO BE
1 FT. / 30 CM ( MIN. ) ABOVE
THIS NORMALLY EXPECTED LEVEL.
TYPICAL ROOF PENETRATIONS
( SUGGESTED TERMINATION CONFIGURATIONS )
EXHAUST STACK IS DOWNWIND
OF AIR INTAKE OPENING
VSRT
BOILER
( SIDE VIEW )
NOTE:
AIR INTAKE AND EXHAUST TERMINATION SHOULD BE
SEPARATED AS FAR AS POSSIBLE TO PREVENT FLUE GAS
RECIRCULATION DURING DIFFERENT WIND CONDITIONS.
AIR INLET
NOTE:
1.) When using horizontal runs follow a 1/4" per foot rise to run ratio
2.) Maintain minimum 9" / 22.86 cm air space clearances to combustables,
wires and insulation
3.) Install support straps at 5 FT / 152 CM horizontal intervals and at elbows
FIGURE 30 - ROOF PENETRATION DETAILS FOR VSRT 9.5-125 BHP
Содержание VSRT Series
Страница 2: ......
Страница 84: ... FultonGroupN A 2022 OPERATION VSRT IOM 2022 0728 SECTION3 3 20 THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 102: ... FultonGroupN A Inc 2022 MAINTENANCE TROUBLESHOOTING VSRT IOM 2022 0728 SECTION4 4 18 PAGE LEFT INTENTIONALLY BLANK ...
Страница 115: ...Questions PleaseContactYourLocalManufacturer sRepresentative SECTION5 VSRT IOM 2022 0728 SERVICEDOCUMENTS 5 13 NOTES ...
Страница 116: ... FultonGroupN A 2022 SERVICEDOCUMENTS VSRT IOM 2022 0728 SECTION5 5 14 NOTES ...
Страница 117: ...Questions PleaseContactYourLocalManufacturer sRepresentative SECTION5 VSRT IOM 2022 0728 SERVICEDOCUMENTS 5 15 NOTES ...