VMP-IOMM-2018-2
Fulton Ltd
Page 55
MAINTENANCE - 5
10.
Visually inspect
the internal water space (see
Section 5.6
).
11.
Clean the water level gauges
(sight glasses).
If any leakage is evident, the gasket needs replacing (see
Section 5.7
).
12.
Clean any water traps and strainers fitted in the feedwater line.
Check feedwater and boiler water quality against the values given in
Appendix A - TI-139-
Recommended Water Conditions
.
Note: Use only genuine Fulton replacement parts.
WARNING
Ensure the main electrical supply is isolated before starting work.
!
5.8.3
MONTHLY
IN ADDITION
5.8.4
SIX MONTHLY SERVICE
The boiler must be drained and isolated before the following maintenance procedures are
carried out
(see
Section 4.6 - Draining the Boiler
).
1. Visually inspect feedwater pipe into the boiler.
Ensure the pipe is not blocked, clean as required.
2. Clean the ignition electrode.
3.
Clean out the flue passes.
4. Apply a small quantity of oil to the bearings of the burner motor and the feedwater pump
motor.
5. Clean the burner scroll fan.
6. Remove components from threaded stub pipes, clean and inspect.
7. Rod through top connections of the water level gauge and water bottle.
8.
Drain and flush the feedwater tank. Clean any filters in the tank, in the feedwater line or in the
feedwater pump.
9. Clean the water level probes.
10.
Test the flue using the following procedures:
•
Visual Inspection
•
Smoke Test
11. Check the burner combustion.
12.
Check the condition of the gas valve filter (if fitted), renew as required.
WARNING
Maintenance on gas related parts of a boiler must be carried out by competent, trained personnel who are GAS
SAFE/ACS registered, and who have the necessary equipment to check combustion.
!
Содержание VMP Series
Страница 8: ...VMP IOMM 2018 2 Fulton Ltd Page VIII...
Страница 25: ...VMP IOMM 2018 2 Fulton Ltd Page 17 INSTALLATION 2 Figure 10 Electrical Customer Terminal Connections...
Страница 30: ...VMP IOMM 2018 2 Fulton Ltd Page 22...
Страница 66: ...VMP IOMM 2018 2 Fulton Ltd Page 58...
Страница 100: ...VMP IOMM 2018 2 Fulton Ltd Page 92...
Страница 102: ...VMP IOMM 2018 2 Fulton Ltd Page 94 APPENDIX C...