VMP-IOMM-2018-2
Fulton Ltd
Page 53
MAINTENANCE - 5
WARNING
Prior to the commencement of any work requiring the removal of cover plates and the opening of the
control panel box, the electrical supply to the boiler must be isolated.
Ensure any residual pressure within the boiler is completely vented before working on the pressure
vessel.
!
CAUTION
It is essential that regular checks are made to ensure that scale build-up is not taking place within the
boiler. Such checks will ensure that water treatment being applied to the boiler feedwater is effective.
Make sure that lifting equipment complies with all local regulations and is suitable for the job.
you can be injured if you use faulty lifting equipment.
Make sure the lifting equipment is in good condition.
!
IMPORTANT
If any fault is found during these procedures, shut-down the boiler immediately and
consult Fulton Ltd.
!
5.8
SCHEDULE OF OPERATOR TESTS AND CHECKS
The following schedule is the advice of Fulton Ltd. The frequency of tests and checks may vary
according to site risk assessment and/or specific requirements of the country/territory that the
boiler is installed in. Failure to maintain the boiler adequately may void the Fulton guarantee.
Maintenance on gas related parts of a boiler must be carried out by competent, trained
personnel who are GAS SAFE/ACS registered, and who have the necessary equipment to check
combustion.
If any fault is found during these operations, contact your Fulton representative.
The following procedures are designed to prevent the build-up of scale, silt or sludge in the
bottom of the boiler, water level gauge (sight glass) and water bottle pipework. Personnel involved
in doing this work must have received the appropriate training in all aspects of maintenance and
safety procedures.
In addition to these procedures, the advice of a water treatment specialist should be sought and
followed.
Содержание VMP Series
Страница 8: ...VMP IOMM 2018 2 Fulton Ltd Page VIII...
Страница 25: ...VMP IOMM 2018 2 Fulton Ltd Page 17 INSTALLATION 2 Figure 10 Electrical Customer Terminal Connections...
Страница 30: ...VMP IOMM 2018 2 Fulton Ltd Page 22...
Страница 66: ...VMP IOMM 2018 2 Fulton Ltd Page 58...
Страница 100: ...VMP IOMM 2018 2 Fulton Ltd Page 92...
Страница 102: ...VMP IOMM 2018 2 Fulton Ltd Page 94 APPENDIX C...